This is the front edge with the steps and the whole thing measures about 24ft long. Most of this is recycled wood from my neighbors old decks. Yes two of them were taken down and they were then hauled here and we made this out of it.
We have about $320 in screws and extra wood we needed because of hand rails and supports underneath. We figured it would have cost us new and labor almost $5000 if someone else came in and did the construction for us. So I am glad he was still able to get it made before it was a needed thing. Now to get it stained and ready for Winter. Chris
1 comment:
repurposing/recycling is always a good thing. Great job.
Post a Comment